The first 12-foot section of the new workshop wall is now covered with 1/4-inch plywood.
This new floor and wall section is being built next to the main machine trailer, which already holds four machines. The floor extension is supported by heavy load-bearing beams and will become part of the larger workshop surrounding the trailers.
In this episode, I finish the plywood wall sheathing, install diagonal braces between the posts and roof beams to prevent the structure from swaying in the wind, and begin leveling the ground for three additional beams that will support the next 12-foot section of the floor.
I also load two vintage machines onto another trailer: a Simmons Micro-Speed No. 2 lathe and a Siber Hegner RB-1 milling machine. This trailer will be used to move them under the new roof, where I will build the second half of the permanent floor around their future positions.
The plywood wall will later be covered with building wrap and dark anodized aircraft aluminum sheets.
* * *
Первая 12-футовая секция новой стены мастерской теперь обшита фанерой толщиной 1/4 дюйма.
Новый пол и стена строятся рядом с основным прицепом, на котором уже установлены четыре станка. Продолжение пола опирается на массивные несущие балки и станет частью большой мастерской, окружающей прицепы.
В этой серии я заканчиваю обшивку стены фанерой, устанавливаю косые распорки между столбами и балками крыши для защиты конструкции от раскачивания ветром, а также начинаю выравнивать грунт под три дополнительные балки для следующей 12-футовой секции пола.
Кроме того, я погружаю на другой прицеп два старых станка: токарный Simmons Micro-Speed No. 2 и фрезерный Siber Hegner RB-1. Этот прицеп нужен, чтобы перевезти станки под новую крышу, где вокруг их будущих мест я построю вторую половину постоянного пола.
Позже фанера будет закрыта строительной мембраной и тёмными анодированными листами авиационного алюминия.
#TrailerMachineShop #VintageMachinery #WorkshopBuild