Welcome to YTUnity

One free SpiderTaz Network account works across every network site.

Featured creators

Creators on the SpiderTaz Network

Become a creator →

Video: Nov 05, 2020 || ৩০০০ সিরিজের নতুন লোকো || Brand New 3006 taking PLC at Chinki Astana Station

deshi train Video 2 months ago

Description

Video: November 05, 2020 || ৩০০০ সিরিজের নতুন লোকোমোটিভ || Brand New 3006 taking PLC at Chinki Astana Railway Station

TOKEN SYSTEM IN BANGLADESH RAILWAY (PLC/ Paper Line Clearance)

This System is originated in the Era of British Railways Means when the British have Started Railways in subcontinent or Bangladesh.
In railway signaling, the ring (A large one made of metal or bamboo with a small leather pouch attached to it. A written communication will be placed in the leather pouch.) is a token — a physical object which a locomotive driver is required to have or see before entering onto a particular section of single track.
The token is clearly endorsed with the names of the section it belongs to. Token Exchange System is nothing but a safety measure tool which basically ensures that the track is totally clear and free from any obstacle. This system basically used for single lines because of the very much greater risk of serious collision in the event of irregular working by signalmen or train crews, than on double lines.
It is a communication link between the railway stations and the stations to the moving trains practiced before development of modern communication systems.
A railway staff will hold it and stand on the platform or any other pre-decided place. The engine driver or the guard as the case may be grabs the ring from the moving train. The ring from the previous station or pre-decided place would be passed on to the staff on platform or pre-decided place in similar way.

Technical Specifications of Locomotive Class : 3000

Designer : Electro Motive Diesel Inc.
Builder/ Manufacturer: Hyundai ROTEM & EMD
Model: EMD GT38ACL (Full A/C, Single Cab)
Number: 3020
Prime mover : EMD E710G3A
Fuel capacity : 3,800 liters (840 imp gal; 1,000 US gal)
Engine type : Two-stroke
Power Output: 2200 HP
Maximum Speed : 110 Km/h (68 mph)
Total Weight : 108 Ton
Locomotive Brake : Air Brake System
Gauge : 1,000 mm (3 ft 3+3⁄8 in) 3020 is convertible from 1000 mm to 1,676 mm by switching bogies
Length : 18.942 m (62.15 ft)
Height : 3.766 m (12.36 ft)
Owner: Bangladesh Railway (বাংলাদেশ রেলওয়ে)

Location: Chinki Astana Railway Station (চিনকি আস্তানা রেলওয়ে ষ্টেশন), চিনকি আস্তানা (Chinki Astana), Jorarganj Union (জোরারগঞ্জ ইউনিয়ন), Mirsharai Upazila (মীরসরাই উপজেলা), Chattogram District (চট্টগ্রাম জেলা), Bangladesh (বাংলাদেশ)
Video Capturing Date: 05.11.2020 (November 05, 2020)

#locomotive
#locomotives
#deshi_train
#bangladesh_railway
#train_video
#train