Description
The SIVACON S8 in double-front design helps optimize power distribution projects by reducing the required floor space by up to 16.6%, lowering power losses by up to 25% through an energy-efficient design, and reducing material usage with up to 50% less copper in the main busbar system. This also contributes to around 10% less CO₂ emissions during production, helping to lower total operating costs while supporting sustainability goals.
https://sie.ag/569JH9
